• Document: Embedded Generation Connection Application Form
  • Size: 80.38 KB
  • Uploaded: 2019-06-13 01:16:09
  • Status: Successfully converted


Some snippets from your converted document:

Generation Planning & Transmission Capacity Capacity Planning, Asset Management Toronto Hydro-Electric System Limited 500 Commissioners Street, 3rd Floor Toronto, Ontario, M4M 3N7 Embedded Generation Connection Application Form This Application Form provides information required for an initial assessment of the Embedded Generation project. All applicable sections must be completed and all the required documents must be submitted with this form 1. Application Type: OPA FIT Reference Number: Feed-in- OPA FIT Project ID Number: Tariff (FIT) Program OPA Contract Date: Net Metering Other Specify: 2. Contact Information: Toronto Hydro Embedded Generation Engineering Consultant Service Location System Owner - (Electrical/Developer) – site of project – owner of project Company/ Person Address Street City Postal Code Contact Name Telephone Cell E-mail Fax 3. Billing Contact: Toronto Hydro Customer EG System Owner Engineering Consultant Other (please specify): Embedded Generation Connection Application Form - March 30, 2012 Page 1 of 9 Generation Planning & Transmission Capacity Capacity Planning, Asset Management Toronto Hydro-Electric System Limited 500 Commissioners Street, 3rd Floor Toronto, Ontario, M4M 3N7 4. Project Description: Proposed Start of Construction: (dd/mm/yyyy) Dates: Proposed In-Service: (dd/mm/yyyy) *Please provide a construction schedule outlining relevant dates. GST/HST Number: Account: Toronto Hydro Account Number: Proposed Total Capacity (kW): = [A] × [B] Proposed Total Capacity, Future (kW): Size: [A]: Number of Units: [B]: Rating of Each Unit (kW): Output voltage (V): Number of Phases: one three Synchronous Induction Inverter** Type: Other, please specify: Solar Photovoltaic Renewable Biomass Fuel Type: Wind Bio-gas Co-generation/CHP Generator: Other, please specify: Manufacturer Model Number Total capacity (kW): Yes, existing load kW Load Displacement? new load kW Mode of No Operation: Power Export? Yes No kW Peak Period Only? Yes No kW ** Technical Information on inverter shall be provided with the connection application. Only Canadian Standards Association (CSA) approved inverters are acceptable. A single-phase inverter can ONLY connect on a single-phase system and a three-phase inverter MUST be used on a three-phase system. Single-phase inverters WILL NOT be allowed to connect on three-phase systems. Embedded Generation Connection Application Form - March 30, 2012 Page 2 of 9 Generation Planning & Transmission Capacity Capacity Planning, Asset Management Toronto Hydro-Electric System Limited 500 Commissioners Street, 3rd Floor Toronto, Ontario, M4M 3N7 5. Single Line Diagram (SLD) - stamped and signed by a Professional Engineer Provide an updated SLD of the Generating Facility, signed by a Professional Engineer, which includes the Interface Point/Point of Common Coupling (“PCC”) to Toronto Hydro’s distribution system. The SLD shall contain details on the following: • Electrical equipment at the embedded generation facility, principal ratings, impedances, winding configurations, neutral grounding methods, etc. • Protective relaying, synchronizing and revenue metering arrangements. The device numbers should be in accordance with IEEE Standard Electrical Power System Device Function Numbers (ANSI/IEEE C37.2).

Recently converted files (publicly available):